Our Pre- processing lines are available with throughput up to 40 TPH with sizing less than 35 mm.
- Through Pre-processing waste changes to AFR.
- Pre-processing involves shredding, segregation, de-dusting, removal of C&D waste, and removal of ferrous and non-ferrous material, sizing.
- AFR Pre processing lines are specially designed to handle different kinds of waste depending upon their properties.
- Equipment selection needs to be specific depending on the material’s physical & chemical properties.
Depending upon the process requirement and the material characteristics, combination of following equipment can be used to offer a complete solution.
- Primary shredder
- Secondary Shredders
- Magnetic Separator
- Trommel Screens
- Air Density separators
- De-dusting & Dust collection systems